Documents Certified

Terminal 1 Modernization Project


TERMINAL 1 MODERNIZATION PROJECT

 


The proposed project includes reconfiguring the existing terminal uses to improve passenger services and amenities, better accommodate security requirements, and improve curbside circulation. Additional components include an addition to the building square footage; modifications of the gates, including an overall reduction of one gate (from 15 gates to 14); upgrading existing mechanical systems and infrastructure; interior improvements; and potential upgrades to the exterior façade.

The project site is within the eastern portion of Los Angeles International Airport (LAX), within the existing Terminal 1 located within the airport’s Central Terminal Area. Related construction staging activities would occur on other airport property

Copies of the Initial Study/Proposed Negative Declaration are available for review in the following libraries:

  • Westchester-Loyola Village Branch: 7114 W. Manchester Avenue, Los Angeles, CA 90045
  • El Segundo Library: 111 W. Mariposa Avenue, El Segundo, CA 90245; and
  • Inglewood Library: 101 W. Manchester Boulevard, Inglewood, CA 90301
Public Comments

Comments on the document must be received by 5:00 p.m. on April 2, 2014
Submitting Comments by Mail: 
Christopher Koontz, Chief of Airport Planning
P.O. Box 92216
Los Angeles, CA 90009-2216

Submitting Comments online click here


Environmental Documents

California Environmental Quality Act (CEQA)



Back To Top